{"id":19404,"date":"2026-09-30T05:00:28","date_gmt":"2026-09-30T03:00:28","guid":{"rendered":"https:\/\/brekoverband.de\/?p=19404"},"modified":"2026-09-30T14:22:57","modified_gmt":"2026-09-30T12:22:57","slug":"joint-statement-europe-needs-a-clear-and-predictable-path-from-copper-to-fibre","status":"publish","type":"post","link":"https:\/\/brekoverband.de\/en\/2026\/09\/30\/joint-statement-europe-needs-a-clear-and-predictable-path-from-copper-to-fibre\/","title":{"rendered":"Joint Statement: Europe needs a clear and predictable path from copper to fibre"},"content":{"rendered":"<p><strong>Brussels, 30 September 2026 \u2013<\/strong> Nineteen European associations and organisations from the municipal, business, energy, digital, and infrastructure sectors have organised a joint call for a timely and investment-friendly framework for Europe\u2019s copper switch-off.<\/p>\n<p>The <a href=\"https:\/\/brekoverband.de\/wp-content\/uploads\/2026\/09\/260930_CSO_Joint-Statement.pdf\" target=\"_blank\" rel=\"noopener\">Joint Statement<\/a> includes concrete proposals for a clear and practical transition from copper to full fibre within the Digital Networks Act (DNA). The copper switch-off is more than retiring legacy infrastructure. The transition to fibre is a strategic step towards the high-capacity, resilient and future-proof connectivity Europe needs for its digital economy, technological sovereignty and competitiveness.<\/p>\n<p>The DNA is an important opportunity to set a clear direction for this transition. The signatories call on European policymakers to establish an objective, rule-based copper switch-off framework and to develop the technical details for its implementation at an early stage. The switch-off process should be triggered by the availability of fibre infrastructure and include an ambitious threshold of homes passed.<\/p>\n<p>A well-managed transition must take account of consumers and all market participants. At the same time, any delays prolong the parallel operation of copper and fibre networks and weaken the investment certainty needed for further fibre deployment. The transition from copper to fibre is not simply a question of technology, but also of timing, predictability and investment conditions.<\/p>\n<p>With their Joint Statement, the associations contribute concrete proposals to the European policy debate and underline the wider significance of the transition as strategic infrastructure for Europe\u2019s digital future.<\/p>\n<p>Read the full Joint Statement <a href=\"https:\/\/brekoverband.de\/wp-content\/uploads\/2026\/09\/260930_CSO_Joint-Statement.pdf\" target=\"_blank\" rel=\"noopener\">here<\/a>.<\/p>\n<p>The 19 signees are: Federal Association for Broadband Communication (BREKO), German Association of Local Public Utilities (VKU), German Association of Energy and Water Industries (BDEW), Swedish Local Fibre Alliance, Fibre Alliance Denmark, The Broadband Association (ANGA), ALTO \u2013 Association of Licensed Telecommunications Operators, German Association of Public Services \u2013 German section of CEEP e.V. (bv\u00f6d), CEDEC \u2013 European Federation of Local &amp; Regional Energy Companies, The German County Association (DLT), Der Mittelstand. BVMW, European Entrepreneurs CEA-PME, FNCCR, Macquarie Group, Open Fiber,\u00a0 Association of Austrian Municipalities, SGI Europe and V\u00d6WG &amp; VK\u00d6.<\/p>\n<p>&nbsp;<\/p>\n<p>Contacts for this press release are:<\/p>\n<p><strong>The Federal Association for Broadband Communication (BREKO)<\/strong><\/p>\n<p>Lea K\u00f6ster | E-Mail:\u00a0<a href=\"mailto:presse@brekoverband.de\">presse@brekoverband.de<\/a><\/p>\n<p>Phone: +49 176 300 209 48<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>German Association of Local Public Utilities (VKU)<\/strong><\/p>\n<p>Kathrin Mohr| E-Mail:\u00a0<a href=\"mailto:mohr@vku.de\">mohr@vku.de<\/a><\/p>\n<p>Phone: <a href=\"tel:+49%2030%2058580-227\">+49 30 58580-227<\/a> | <a href=\"tel:+49%20170%208580-227\">+49 170 8580-227<\/a><\/p>\n<p>&nbsp;<\/p>\n<p><strong>German Association of Energy and Water Industries (BDEW)<\/strong><\/p>\n<p>Adrian R\u00f6hrig | E-Mail:\u00a0 <a href=\"mailto:adrian.roehrig@bdew.de\">presse@bdew.de<\/a><\/p>\n<p>Phone: +49 30 300199-1176<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Swedish Local Fibre Alliance<\/strong><\/p>\n<p>Louise Thorselius | E-Mail:\u00a0<a href=\"mailto:louise.thorselius@stadsnatsforeningen.se\">louise.thorselius@stadsnatsforeningen.se<\/a><\/p>\n<p>Phone: +46 76110 02 88<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n<p><strong>Fibre Alliance Denmark<\/strong><\/p>\n<p>Morten Baadsgaard Trolle | E-Mail:\u00a0<a href=\"mailto:MOB@greenpowerdenmark.dk\">MOB@greenpowerdenmark.dk<\/a><\/p>\n<p>Phone: +45 22 75 04 18<\/p>\n<p><strong>\u00a0<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Deutsche Telekom continues to abuse its dominant market position by strategically overbuilding the fiber optic networks of its competitors, thereby massively hindering them. The industry associations BREKO and VATM have now called on the Federal Network Agency (BNetzA) to take action against this abusive behavior by a company with considerable market power. <\/p>\n","protected":false},"author":2129,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[66],"tags":[],"class_list":["post-19404","post","type-post","status-publish","format-standard","hentry","category-press-releases"],"acf":[],"_links":{"self":[{"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/posts\/19404","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/users\/2129"}],"replies":[{"embeddable":true,"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/comments?post=19404"}],"version-history":[{"count":6,"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/posts\/19404\/revisions"}],"predecessor-version":[{"id":19422,"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/posts\/19404\/revisions\/19422"}],"wp:attachment":[{"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/media?parent=19404"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/categories?post=19404"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/brekoverband.de\/en\/wp-json\/wp\/v2\/tags?post=19404"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}